A national, multicentric, randomised, controlled trial. Applications of a critical pathway using LEVOFLOXACIN for the management of patients with abnormal PSA
- Conditions
- prostatitisMedDRA version: 6.1Level: SOCClassification code 10038359
- Registration Number
- EUCTR2004-000805-23-IT
- Lead Sponsor
- GLAXO SMITHKLINE
- Brief Summary
Not available
- Detailed Description
Not available
Recruitment & Eligibility
- Status
- ot Recruiting
- Sex
- Male
- Target Recruitment
- 240
Inclusion Criteria
Are the trial subjects under 18? no
Number of subjects for this age range:
F.1.2 Adults (18-64 years) yes
F.1.2.1 Number of subjects for this age range
F.1.3 Elderly (>=65 years) no
F.1.3.1 Number of subjects for this age range
Exclusion Criteria
Not provided
Study & Design
- Study Type
- Interventional clinical trial of medicinal product
- Study Design
- Not specified
- Primary Outcome Measures
Name Time Method
- Secondary Outcome Measures
Name Time Method