Randomised Controlled Trial of Boiler Management Systems in Social Housing in Camden: An Assessment of Health, Environmental and Economic Outcomes
试验速览
- 阶段
- 不适用
- 状态
- 已完成
- 入组人数
- 150
- 试验地点
- 1
- 主要终点
- Thermal energy (degrees Celsius) at hot tap of bath
研究概览
简要总结
The purpose of this study is to evaluate the impact of a passive safety measure, namely a reduction in centrally controlled hot tap water temperatures in social housing using a boiler management system, as an effective public health intervention.
详细描述
The annual hospital admission rate in England for burns and scalds is 31 children per 100,000 population. While reducing the temperature in domestic hot water tanks is a recommended injury prevention strategy, the UK has been slow to adopt such 'passive' safety measures. However, Camden Council employs a Boiler Management System (BMS) in boiler houses to centrally set the hot water temperature for parts of its social housing stock, providing the opportunity to evaluate various impacts of a 'passive' safety measure, including quantifying the effects of the BMS on average hot water temperatures at delivery, annual energy costs, and annual greenhouse gas emissions; modelling the reduction in scald injuries; identifying the cost-effectiveness of the system as a public health intervention; as well as describing experiences/ perceptions of risk of scalding and identifying health and social benefits of the BMS. Boiler houses with BMS will be randomised to remain at their constant set temperature or to BMS reduced temperature and sterilisation programme. A process evaluation will also be undertaken to assess the acceptability of water temperatures to tenants.
研究设计
- 研究类型
- Interventional
- 分配方式
- Randomized
- 干预模型
- Parallel
- 盲法
- None
入排标准
- 年龄范围
- 18 Years 至 —(Adult, Older Adult)
- 性别
- All
- 接受健康志愿者
- 是
入选标准
- •Individuals living in social housing in the London Borough of Camden where the Boiler Management system has been installed.
排除标准
- •Aged under 18 years
研究组 & 干预措施
BMS and sterilisation
BMS and sterilisation programme will be delivered
干预措施: BMS and sterilisation programme (Other)
BMS standard water heating
结局指标
主要结局
Thermal energy (degrees Celsius) at hot tap of bath
时间窗: after 1 minute
次要结局
- Acceptability of hot water temperature delivered to tenant(Up to 2-3 months post-intervention)
