跳至主要内容
临床试验/NCT00874692
NCT00874692已完成不适用

Randomised Controlled Trial of Boiler Management Systems in Social Housing in Camden: An Assessment of Health, Environmental and Economic Outcomes

London School of Hygiene and Tropical Medicine1 个研究点 分布在 1 个国家目标入组 150 人开始时间: 2009年4月1日最近更新:
适应症
干预措施

试验速览

阶段
不适用
状态
已完成
入组人数
150
试验地点
1
主要终点
Thermal energy (degrees Celsius) at hot tap of bath

研究概览

简要总结

The purpose of this study is to evaluate the impact of a passive safety measure, namely a reduction in centrally controlled hot tap water temperatures in social housing using a boiler management system, as an effective public health intervention.

详细描述

The annual hospital admission rate in England for burns and scalds is 31 children per 100,000 population. While reducing the temperature in domestic hot water tanks is a recommended injury prevention strategy, the UK has been slow to adopt such 'passive' safety measures. However, Camden Council employs a Boiler Management System (BMS) in boiler houses to centrally set the hot water temperature for parts of its social housing stock, providing the opportunity to evaluate various impacts of a 'passive' safety measure, including quantifying the effects of the BMS on average hot water temperatures at delivery, annual energy costs, and annual greenhouse gas emissions; modelling the reduction in scald injuries; identifying the cost-effectiveness of the system as a public health intervention; as well as describing experiences/ perceptions of risk of scalding and identifying health and social benefits of the BMS. Boiler houses with BMS will be randomised to remain at their constant set temperature or to BMS reduced temperature and sterilisation programme. A process evaluation will also be undertaken to assess the acceptability of water temperatures to tenants.

研究设计

研究类型
Interventional
分配方式
Randomized
干预模型
Parallel
盲法
None

入排标准

年龄范围
18 Years 至 —(Adult, Older Adult)
性别
All
接受健康志愿者
是

入选标准

  • •Individuals living in social housing in the London Borough of Camden where the Boiler Management system has been installed.

排除标准

  • •Aged under 18 years

研究组 & 干预措施

BMS and sterilisation

Experimental

BMS and sterilisation programme will be delivered

干预措施: BMS and sterilisation programme (Other)

BMS standard water heating

No Intervention

结局指标

主要结局

Thermal energy (degrees Celsius) at hot tap of bath

时间窗: after 1 minute

次要结局

  • Acceptability of hot water temperature delivered to tenant(Up to 2-3 months post-intervention)

研究者

研究点 (1)

Loading locations...

相似试验