跳至主要内容
临床试验/NCT05974215
NCT05974215已完成不适用

Peri Implant Marginal Bone Height and Density Supporting Different Prosthesis Restoring Single Edentulous Mandible

Menatallah Mohamed Elhotieby2 个研究点 分布在 1 个国家目标入组 10 人开始时间: 2023年4月1日最近更新:
适应症

试验速览

阶段
不适用
状态
已完成
发起方
入组人数
10
试验地点
2
主要终点
assessment of change of bone height around dental implants

研究概览

简要总结

This study aims to evaluate the effect of mandibular implant supported removable overdenture on bone height and density and compare it with implant supported fixed overdenture in single mandibular overdenture.

详细描述

In this study 10 patients will be selected following inclusion and exclusion criteria. In each group 5 patients (each patient will receive 6 implants) will be divided randomly into two groups.

Group I patients will receive mandibular implant supported removable overdenture, while Group II will receive mandibular implant supported fixed overdenture.

All patients will be given the usual home care instructions about wearing and caring of dentures and opposing arch. Regarding dentures, removal of them at night and cleaning with denture brush and mild soap will be required. Measurements of Bone height and Bone density will be obtained by using Cone Beam Computed Tomography (CBCT).

Measurements will be obtained at denture insertion, after 1 month and after 3 months.

研究设计

研究类型
Interventional
分配方式
Randomized
干预模型
Parallel
主要目的
Treatment
盲法
Single (Participant)

盲法说明

each patient was not informed about type of received restoration

入排标准

年龄范围
40 Years 至 50 Years(Adult)
性别
Male
接受健康志愿者

入选标准

  • Non-smoker Patients
  • Highly cooperative and motivated patients.
  • Patients Systemically free from any immunosuppressive diseases.

排除标准

  • Diabetic, hypertensive, cancer patients.
  • Mandibular arch with thin knife edge, flat or flabby ridge, recent extractions and foreign bodies.
  • Patients with temporo-mandibular joint disorders and bad oral habits.

结局指标

主要结局

assessment of change of bone height around dental implants

时间窗: on the first day, on 30th day, 90th day

bone height was assessed by cone beam computed tomography

assessment of change of bone density around dental implants

时间窗: on the first day, on 30th day, 90th day

bone density was assessed by cone beam computed tomography

次要结局

未报告次要终点

研究者

发起方
Menatallah Mohamed Elhotieby
申办方类型
Other
责任方
Sponsor Investigator
主要研究者

Menatallah Mohamed Elhotieby

researcher fixed and removable prosthodontics

National Research Centre, Egypt

研究点 (2)

Loading locations...

相似试验

Peri Implant Marginal Bone Height and Bone Density | 临床试验