ACTRN12619000665134招募中未知
A multicentre, qualitative evaluation of the impact of advertised Emergency Department (ED) wait time on ED patients, potential patients and other stakeholders.
Dr Michael Ben-Meir0 个研究点目标入组 50 人开始时间: 2019年5月3日最近更新:
适应症
试验速览
- 阶段
- 未知
- 状态
- 招募中
- 发起方
- 入组人数
- 50
研究概览
简要总结
暂无简介。
研究设计
- 研究类型
- Observational
入排标准
- 年龄范围
- 18 Years 至 o limit(—)
- 性别
- All
入选标准
- •Convenience sample based on researcher availability, with purposive sampling of a variety of times and days of the week.
- •Patients: Current emergency medicine patients waiting for care or waiting for completion of emergency medicine care (at facilities that have published wait times and those that don’t)
- •Paramedics: Paramedics waiting to offload patients from ambulance stretchers to beds in emergency departments
- •All patients (or their guardians/support persons) and paramedics who are potentially eligible for inclusion in the study will be invited to participate.
排除标准
- •Any patient/paramedic or community representative who does not consent
- •Any patient deemed incapable of consent due to illness, capacity or communication barriers
- •Any patient who exhibits significant distress
- •Any patient whose treatment would be impeded or delayed by the interview (as judged by the patient, interviewer or clinical staff)
- •Any paramedic who is required to attend to a patient rather than undertake the interview, based on patient needs (note 2 paramedics accompany a patient, usually one attends to the patient whilst the other is available to talk for short periods of time).
研究者
相似试验
已完成
不适用
CORPUS 1 pilot study: evaluating the impact of physical capacity on the quality of single operator continuous-chest-compression-only cardio pulmonary resuscitatioISRCTN70447230Heart Centre Hasselt vzw (Belgium)15
招募中
不适用
Epidemiological cross-sectional study on the impact of malocclusion and habits on oral health and quality of lifeAnomalies of dental arch relationshipK02.0K07.0K07.1K07.2K07.3K07.4K07.5K07.6K07.8K05.0K05.1K05.2K05.3K05.4K03.0K03.1K03.2K03.6K03.7K03.8K13.1K13.2K13.3K13.4K13.5K13.6K13.7F99Caries limited to enamelMajor anomalies of jaw sizeAnomalies of jaw-cranial base relationshipAnomalies of tooth positionMalocclusion, unspecifiedDentofacial functional abnormalitiesTemporomandibular joint disordersOther dentofacial anomaliesAcute gingivitisChronic gingivitisChronic periodontitisPeriodontosisExcessive attrition of teethAbrasion of teethErosion of teethDeposits [accretions] on teethPosteruptive colour changes of dental hard tissuesOther specified diseases of hard tissues of teethCheek and lip bitingLeukoplakia and other disturbances of oral epithelium, including tongueGranuloma and granuloma-like lesions of oral mucosaIrritative hyperplasia of oral mucosaOther and unspecified lesions of oral mucosaMental disorder, not otherwise specifiedOral submucous fibrosisHairy leukoplakiaAcute periodontitisDRKS00006208niversitätsklinikum Regensburg,Poliklinik für Kieferorthopädie818
尚未招募
Unknown
Study to measure the impact of a speaking book on patient Understanding of clinical research knowledge.CTRI/2024/06/068453ovartis Healthcare Pvt Ltd.
进行中(未招募)
不适用
未命名试验HBeAg-negative chronic hepatitis BMedDRA version: 15.0Level: LLTClassification code 10008910Term: Chronic hepatitis BSystem Organ Class: 10021881 - Infections and infestationsEUCTR2012-002777-56-ITROCHE
已完成
1 期
A proof of concept, multi-centre evaluation of the potential beneficial effects of CB0011 when combined with CB0012 for the treatment of obstructive sleep apnea.Obstructive Sleep ApneaRespiratory - Sleep apnoeaACTRN12605000688684Cypress Bioscience, Inc100
