跳至主要内容
临床试验/NCT05638113
NCT05638113招募中不适用

Prolonged Air Leakage After Major Lung Resection

Odense University Hospital2 个研究点 分布在 1 个国家目标入组 182 人开始时间: 2023年1月10日最近更新:
适应症

试验速览

阶段
不适用
状态
招募中
入组人数
182
试验地点
2
主要终点
Duration of air leakage until sealed.

研究概览

简要总结

The goal of this prospective randomized controlled trial is to investigate the clinical effects of autologous blood pleurodesis in the treatment of pulmonary air leaks on the first postoperative day following VATS pulmonary resections. Patients will through web-based randomization be randomly assigned into intrapleural instillation of autologous blood (intervention) or standard treatment with ordinary chest drainage (control).

详细描述

The investigators will conduct a randomized controlled trial enrolling patients undergoing elective VATS-lobectomy. Patients will be randomly assigned into two groups through web-based randomization. Air leak will be measured intraoperatively by submersion tests and postoperatively using standard electronic chest tube devices (Thopaz) with a regulated pressure of -10 cmH2O. If an air leak is present on the 1st postoperative day (20 ml/min or greater for at least 6 hours) patients will be invited to participate in this study.

Following informed consent, the patient is randomized on a web-based randomization module to receive intervention or observation. The intervention group will receive intrapleural instillation of autologous blood in accordance with the standard blood patch protocol at Odense University Hospital. In short, 120 ml autologous blood will be drawn from simple venous puncture and immediately injected through the drain into the pleural cavity followed by flushing with 50ml of saline. No anticoagulation or coagulating agents will be added. All other aspects of the patient's postoperative management will be according to the department's standard protocols.

Standard preoperative information on smoking status, medications, medical history of lung diseases, BMI, spirometry as well as DLCO measurements will be recorded. Detailed information about the surgical treatment will also be recorded (site of anatomical resection, adherences, standard perioperative assessment of air leakage, and type of mechanical linear staplers).

All chest drains will be connected to a standard electronic chest tube device (Thopaz) for continuous recording of air leakage and the drain is removed during daytime or evening shifts when air leakage has ceased to 20 ml/min or less for at least 6 hours according to the standard postoperative management. In addition, all included patients will undergo standard postoperative observations, including recording of vital signs (blood pressure, heart rate, fever, saturation-%) and standard blood samples (CRP and leukocyte count) on postoperative day 2 and subsequent daily if there is a suspicion of infection, pleural effusions, empyema and drain-site infections. Pain will be assessed twice daily using a standardized 0-10 visual analog scale (VAS) where 0 represents no pain and 10 the worst imaginable pain.

Electronic recordings of air leakage from the electronic chest tube device will be analyzed from drain placement in the operating room, until drain removal. If air leakage is still present on postoperative day 7, treatment is considered a failure and further management will be individualized by the responsible surgeon including the need for re-operation in accordance with the department's standard of care.

研究设计

研究类型
Interventional
分配方式
Randomized
干预模型
Parallel
主要目的
Treatment
盲法
None

入排标准

年龄范围
18 Years 至 —(Adult, Older Adult)
性别
All
接受健康志愿者

入选标准

  • Patients > 18 years of age
  • Patients willing to give informed consent
  • Patients undergoing VATS lobectomy
  • Patients with a postoperative air leak (> 20ml/min for at least 6 hours).

排除标准

  • Patients < 18 years of age
  • Patients not willing to give informed consent
  • Trauma patients
  • Hypotensive patients and patients with a low blood cell count (anemia, thrombocytopenia)

结局指标

主要结局

Duration of air leakage until sealed.

时间窗: Through study completion, an average of 3 years.

Outcome measure will be assessed when the electronic drain box indicates no further air leak. Data will be reported as hours of air leakage until sealed.

Duration until chest drain removal.

时间窗: Through study completion, an average of 3 years.

Outcome measure will be assessed when the patients chest drain is removed. Data will be reported as hours with chest drain until removed.

Duration of hospital stay.

时间窗: Through study completion, an average of 3 years.

Outcome measure will be assessed when the patient is discharged from the hospital. Data will be reported as days hospitalized until discharge.

次要结局

未报告次要终点

研究者

申办方类型
Other
责任方
Principal Investigator
主要研究者

Finn Ørjar Amundsen Dittberner

Principal Investigator

Odense University Hospital

研究点 (2)

Loading locations...

相似试验