Effect of Flood disaster education Module on Flood disaster preparedness among secondary school student in Selangor,Malaysia
- Conditions
- Flood disaster preparedness among the participant residing at area risk of flooding.flood disaster preparedness, disaster education, disaster preparedness , Extended Parallel Pathway Model, cluster randomization, capacity building, perceived efficacy and threat
- Registration Number
- TCTR20240426001
- Lead Sponsor
- niversity Putra Malaysia
- Brief Summary
Not available
- Detailed Description
Not available
Recruitment & Eligibility
- Status
- Completed
- Sex
- All
- Target Recruitment
- 287
Cluster
1.School was gazetting as temporary shelter place or had history of affected by flood that located at Klang,Gombak, Hulu Langat and Sepang district.
2.School consisted of both male and female students.
3.School that caters student age 13 to 15 years old.
4.Public government mainstream secondary school -or known as Sekolah Menengah Kebangsaan
Individual Participant
1.Age 13 to 15 years old.
2.Malaysian citizen.
3.Able to understand English and or Malays.
4.Get consented or permission from the parents or guardian.
Cluster
1.The selected school were not included if does not received any permission from the head of school principal.
2.Private or international secondary school
Individual
1.Age 16 years old and above
2.Student on medical leave
3.Student that refused to participate the program.
Study & Design
- Study Type
- Interventional
- Study Design
- Not specified
- Primary Outcome Measures
Name Time Method flood disaster preparedness index three point which measured at baseline, immediate post intervention and at 3 month post intervention disaster preparedness index score
- Secondary Outcome Measures
Name Time Method Perceived efficacy and Perceived Threat three point which measured at baseline, immediate post intervention and at 3 month post intervention Risk Behavioural Diagnosis Scale,capacity building three point which measured at baseline, immediate post intervention and at 3 month post intervention capacity building score