跳至主要内容
临床试验/NCT02349373
NCT02349373已完成不适用

The Focus of a Running Schedule and Its Association With the Risk of Running Injuries? A Randomized Trial.

Northern Orthopaedic Division, Denmark1 个研究点 分布在 1 个国家目标入组 839 人开始时间: 2015年4月1日最近更新:
适应症
干预措施

试验速览

阶段
不适用
状态
已完成
发起方
入组人数
839
试验地点
1
主要终点
Running Related Injury (RRI)

研究概览

简要总结

Running is a natural part of human locomotion and humans have been running for million of years. In modern society, running has become a popular way of exercise and is undertaken by many people worldwide, possibly because it provides a cheap and easily accessible form of exercise, and the positive effects of running on health and fitness are well known. Unfortunately, running is also associated with a high risk of injury.

The purpose of this project is to investigate how a running schedule which focuses either on running distance or running speed influence the overall risk of injury and the types of injury sustained in recreational runners.

详细描述

Trails directed at investigating differences in injury risk in relation to the focus of the running schedule have been conducted without any firm conclusions. People engaged in recreational running or choosing running as a new and active lifestyle needs guidance on which running schedules minimize the injury risk, aiding their chance of an active lifestyle and possibly reversing the increase in people developing a lifestyle disease. To develop running schedules minimizing the risk of injury, an understanding of the mechanisms that the different training variables impose on the human body is necessary. The existing literature on running intensity and the development of injuries show conflicting result. More studies are necessary to ascertain if there is a relationship between the intensity of running. In such studies, it is important to include other training variables in the analysis and to quantify running exposure using an objective method of measuring the relative intensity and absolute volume.

研究设计

研究类型
Interventional
分配方式
Randomized
干预模型
Parallel
主要目的
Prevention
盲法
Double (Participant, Investigator)

入排标准

年龄范围
18 Years 至 65 Years(Adult, Older Adult)
性别
All
接受健康志愿者
是

入选标准

  • •on average 1-3 weekly running sessions the past 6 months
  • •owns a pair of running shoes
  • •internet access and mail address
  • •owns a Garmin GPS watch (pulse rate watch) or an IPhone/Android phone

排除标准

  • •previous injury in lower extremity within the past 6 months
  • •unable to follow the running regime in 6 consecutive months
  • •do not want to use GPS (Global Positioning System) watch or Android/Smart phone to register training
  • •unable to read or understand Danish
  • •deprecated by personal GP (General Practitioner) to run due to former surgery or physical disease
  • •mental condition that does not allow participation (e.g. externalizing behaviors, dementia)
  • •pregnancy
  • •participants with blood pressure above normal according to WHO guidelines will need to consult own GP (General Practitioner) for approval

研究组 & 干预措施

Preconditioning running

Active Comparator

An 8 week preconditioning period. The variables of interest are running distance and running intensity: running speed >80% VO2max (maximal oxygen uptake).

干预措施: An 8 week preconditioning period (Behavioral)

Follow-up period

Active Comparator

The Volume group progress 23% in total weekly running distance in the last adaptation week in the prior 4 week block.

The Intensity group progress 23% in weekly distance of running above 80% VO2 max (maximal oxygen uptake), based on the distance of running above 80% VO2max in the last adaptation week in the prior 4 week block.

干预措施: 16 week training period (Behavioral)

结局指标

主要结局

Running Related Injury (RRI)

时间窗: 24 weeks

An injury will be reported through the online training diary. If the runners are injured an appointment for clinical examination is made with the diagnostic staff.

次要结局

  • Symptoms of overuse injury(24 weeks)

研究者

发起方
Northern Orthopaedic Division, Denmark
申办方类型
Other
责任方
Sponsor

研究点 (1)

Loading locations...

相似试验

Focus of a Running Schedule and Risk of Running... | 临床试验