Sleep Inertia and Functional Connectivity Between Brain Regions at Awakening : a Functional Magnetic Resonance Imaging (fMRI) Study
试验速览
- 阶段
- 不适用
- 状态
- 已完成
- 入组人数
- 55
- 试验地点
- 2
- 主要终点
- Measure: Change of correlation values between the BOLD (Blood Oxygenation Level Dependent) signal time series of the brain regions of the default mode network (DMN) between the scans before and after the nap slot.
研究概览
简要总结
The aim of the study is to investigate the functional connectivity between the brain regions of the default mode network before and after a 40 min nap slot in the afternoon. The hypothesis is that connectivity between brain regions will be decreased after the nap as compared to before the nap.
研究设计
- 研究类型
- Interventional
- 分配方式
- Non Randomized
- 干预模型
- Single Group
- 主要目的
- Basic Science
- 盲法
- None
入排标准
- 年龄范围
- 18 Years 至 65 Years(Adult, Older Adult)
- 性别
- All
- 接受健康志愿者
- 是
入选标准
- •65 > age > 18
- •high or law dream recall frequency
排除标准
- •history of psychiatric or neurologic or sleep pathologies
- •counter indication for MRI
研究组 & 干预措施
Subjects with a high dream recall frequency
干预措施: fMRI (Other)
Subjects with a law dream recall frequency
干预措施: fMRI (Other)
结局指标
主要结局
Measure: Change of correlation values between the BOLD (Blood Oxygenation Level Dependent) signal time series of the brain regions of the default mode network (DMN) between the scans before and after the nap slot.
时间窗: fMRI scans will be acquired 5 min before, 5 min after and 25min after the nap slot.
The hypothesis is that connectivity between the brain regions of the default mode network will be decreased after the nap as compared to before the nap and that it will be more the case for subjects with a high dream recall frequency as compared to subjects with a law dream recall frequency. fMRI scans will be acquired before and after a 40 min nap slot in the afternoon. Functional connectivity between brain region will be assessed analyzing the scans with the functional connectivity toolbox (CONN) of the Statistical Parametric Mapping (SPM) software.
次要结局
未报告次要终点
